Backlinks to DiaryRun15 in all Webs (Search ARGOSPublic Web only)

Results from ARGOSPublic web retrieved at 06:54 (GMT)

Commissioning
Commissioning run diaries Run 1st day Run ID Description 20111128 Run # 1 Nov 2011 Installation of dichroic interfaces 20130614 Run Installati...
DayTime20170301
14:00: We switch on DX side. DX LGSW pulse generator is working, WFS camera and BCU are working at 970 Hz. 15:00: We pump the SX WFS camera, pressure was 90mbar o...
DayTime20170302
Power up issues When we power up the SX LGSW the Pupil motor RED Y axis was not homing. We unmount the LGSW panel and we push by hand the stage and at this point ...
DayTime20170303
SX AO Calibration New Pupil motors position BLUE 330 420 YELLOW 371 443 RED 495 402 New calibration 150 modes in OL MH LGSW IM LGSW ...
DayTime20170304
DX AO test New flat on DX adsec with 400 modes made in CL with FLAO. Test old recontrstuctor with 0.8" disturbance. TN AO Gain AO CL TT Res. WF nm rms ...
Number of topics: 5

No backlinks in public webs
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding AOWiki? Send feedback