install and test new limit switches on ARGOS calibration source swing arms (SX & DX)
removal of temporary diagnostic lines on SX ARGOS laser boxes, racks and LGSW (closed IT 6060)
installation of the analog summing amplifier on SX&DX, to improve vibration compensation
characterization of the installed piezo amplifier
LM1 heater firmware update
removal of the temporary accelerometer cables on SX
installation of snap ferrites on the pnCCD sequencer cables to improve EMC situation
arrival of additional ARGOS technical staff today (Marco, Jose and Mathias)
arrival of Chris Biddick for software support