Julian and SR on the mountain. Actions performed:
The new remote power is installed and tested. New engineering gui installed by Jose. Controiller not yet usable with it!!!
The power analyzer can now measure UPS current,
The instrument alarm panel runs permanently on UPS,
JZ measured the propagation shutter speed (results later),
The LLP SX rack is prepared for the TBAD delay installation
we removed a big heap of junk from the ARGOS cabinets.
BNC cables for the
BCU
-Piezo control NOT routed yet
measured the first pulse properties for all lasers. look all more or less like that:
means the FPK is ok for a the lasers. (top trace are the laser pulses, middle: trigger, low: burst trigger)
We read out all innolas laser parameters from the units for reference and cross check.
This topic: ARGOSPublic
>
DiaryTecRun
Topic revision:
12 Aug 2016,
SebastianRabien
Copyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding AOWiki?
Send feedback