20150823_170000 LgswUnitSx is powered off. Disconnected from the rack. 20150823_180000 LgswUnitDx is completely disassembled apart for WfsCamera and lenslet...
Piezo mirrors alignment Alignment of periscopes. The flange has been remachined at LBT for the new periscope mirrors holders. Gola is to get the beam after the pe...
LGSW CalUnit alignment After having assembled the WFS up to the periscope we inserted the calibration unit into it. To start aligning the CalUnit the pupil motors...
Pockels cells installation A try was done to install insulating foam inside the EM shield boxes. Armaflex foam was provided by MPE in several adhesive sheets. Aft...
13:30: we try to calibrate the PatCam to Hexapod movement. We do steps pf 5" around the LGSW FoVs. SX LGSW PatCam to Hexapod IM: 20151019_203311 We determine also...
How to define a subapertures set To create a new subapertures set or just modify the slope computing method you have 2 possibilities: 1 create a new subapertur...
Description This is the new model of PockelsCells rebuild after the OzoneProblem, upgraded to version 2.1 (see PockelsCells) Known history When Where Who ...
Description This is the new model of PockelsCells rebuild after the OzoneProblem, upgraded to version 2.1 (see PockelsCells) Known history When Where Who ...
Description Adaptor box is installed inside the LgswUnit. It gets up to 8 motor connected via DB9 connection on the internal side. On the external side it has 2 m...