8:00: we go up and we switch the fastlink Pathfinder fiber with the ARGOS one.
We plug then the TT fiber on the AGW patch panel (the space there is very tight). We route the other end inside the LGSW rack but 1 over 4 went broken (the fiber head unglued). Speaking with Michael L. we discover that also a first fiber boundle went broken when the crew tryied to route them to the LGSW rack. Opened Topic BrokenTipTiltFiber.
13:00: we have problems both with the REC loading procedure and with the Tubone.