The February 2015 ARGOS campaign started yesterday. Matthias, Mathias and Franz from MPE are on site. The first two days of the campaign have been dedicated mainly to the refurbishment of the LM1 actuators, with the work being currently performed on the DX side, testing the limits of the new actuators. Matthias has also taken measurements for the future mounting of the LAT (Laser Alignment Telescope), which will replace the existing MATS. I reestablished communication to the ARGOS swigarms controller, which had been lost after a power outage (see last note on Issue #5453).-- MarcoBonaglia - 20 Feb 2015