Servicing of LgswUnitDx Entance windows separation is 137mm (nominal is 137.9mm). This is the same distance that we have in the LgswUnitSx. So the field stop is ...
Dx Lgsw cable tray modification We discovered that the new cable tray installed in September would collide both with the LGSW camera and board so we removed the l...
LGSW cabling The sequence of installation was this: 1) PatCams cooling lines, ethernet and power cords 2) Roll bar installation (since the Blue PatCam was reinsta...
DX LGSW setup 9:00 a.m.: we start up the LGSW. There is a problem with the state machine: in the powered off state the Thors are off and when you restart, passing...
8:00: start of activity, telescope at horizon, WG and DP go up to install the camera to measure the LAS pupil mirror to LM1 coordinates orientation. 11:00: telesc...
9:24: system fully started, LGSW, ADSEC, FLAO, IRTC are ready. On the FLAO we load the board setup 2014 05 16 ARGOS cal onaxis. Board stage mm X 70 ...
9:30: start of operations FLAO stages @ 72; 49; 37 mm, created Board setup: 07 NoV 14 ARGOS Cal Unit We have a pbl with calibration manager... LB tryes to fi...