There are 2 electronic racks is installed on the Laser Supply Platform. They contains power distribution, cooling and other LAS devices. They are attached to the main ARGOS power switch and they are cooled by the RegulatedCoolingLine.
describe what is needed to put a new device of this kind into operation state: configuration, firmware uploading, software modifications, ...
Power supply, inlet, outlet, ethernet, fast-link to ASM, optical-fibers from TipTilt, ....