Backlinks to DiaryRun14 in all Webs (Search ARGOSPublic Web only)

Results from ARGOSPublic web retrieved at 19:09 (GMT)

Commissioning
Commissioning run diaries Run 1st day Run ID Description 20111128 Run # 1 Nov 2011 Installation of dichroic interfaces 20130614 Run Installati...
DayTime20161202
17:00: we start to power up the DX system from the new Centos7 machines. We see many problems: i. the GUIs are very lagged, expecially the ones displaying came...
DayTime20161203
LgswDichroicSystemSX interlock check 9:00: handover from LUCI guys. We go up to check for the SX dichroic interlock failures. We set back the ARGOS interlock cabl...
DayTime20161204
LgswUnitSx test w/ ASM We cheked again the PC behavour after 1 night at 40% RH. The BLue and Yellow still look bad: We could close the loop w/ LGSW only and the m...
DayTime20161205
LgswUnitDx calibrations FoV measurement DX HEXA 3.94 2.36 0.73 174 384 We try to measure the LGSW FoV, we close the loop w/ 2015/07 rec but tod...
DayTime20161206
LgswUnitDx test w/ PyramidWfs We put back the systems as it was yesterday, but we find that the pupils are quite shifted (approx 20 30 motor steps). We close the ...
DayTime20161207
Test of pupil recentering w/ slope rms We switch on the system and setup for Pyramid TT. We find again that pupils are not in the proper position (from illuminati...
NightTime20161209
PCT test sx TN AO Gain AO CL TT Res. WF nm rms HO Res. WF nm rms AO rec DIMM " JCL PCL Notes 20161210_000018 0, 0, 0 F NA ...
Number of topics: 8

No backlinks in public webs
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding AOWiki? Send feedback