Visual check 15:00: we climbed on telescope and had a visual check of the LGSWs and LAS boxes status. * The 2 LGSWs appear very muddy, a lot of mud water accum...
Visual Inspection 11:00: telescope back to Zenith, we climb and check the racks: fine. The pressure gauge on SX PNCCD had low battery. We pumped it anyway up to 0...
LgswUnitSx AO calibration 6:45: start of operations, we try to power up from arbitrator. SX BCU fails to boot twice, then we power cicle from Rack I/O and it work...
On telescope work (MB, SR, ML) 9:00: up on telescope to put back LgswUnitSx red EW that was moved when cleaned... Then we check the LgswUnitDx that had a spot on ...
LgswUnitDx work LgswUnitDx installation 9:00: we go up to crane back the LGSW: ML leads the operation. 12:00: installation completed, we go back to control r...
LgswUnitDx work 8:30: WG and MR go to check the cal unit illumination patter. It seems ok, maybe an alignment problem? 10:20: BcuNumber3 fails to connect. We must...
LgswDichroicSystem check In the last days we found many issues with the movement of both the dichroic and fold mirror on the LgswDichroicSystemSX while on the Lgs...
Work on LM1 to make it moth tight. (Hans, Matthias) Checking out new fiber switch. Didn't work out.Light suppression was to high. Main.WolfgangGaessler 24 Oct...
22:00: we get the telescope from LUCI/AO. We disconnect fibers, we try to collimate. 22:30: beam shaping. CCD39 fails to configure G1 * G1_20161019.pdf TN ...
18:30: begin of operations we point to: HESS_J1943p213 * HESS_J1943p213_20161020.pdf Beam shaping: corrector at 255 and focus stage at 75k steps. TN AO G...
19:00 22:00: time allocated to LUCI/AO G111.25 * Problem with the sign in the stages directions signs, solved * Pointing reference position for FLAO is 7...
We have to exchange the PockelsCellDriver6 on the SX side, it fails to power up... ETG0895 * ETG895_20161022.pdf 18:30: pointing telescope. TN AO Gain A...
10:00 LAT/05:00 UT Handover from LUCI/AO * Lorenzo Gustavo where switching fibers. * SX dichroic got stuck while authorization. * Authorization failed ...
LUCI work until 5:00 UT Telescope to horizonFixing SX LM1 A1 absolute encoder. Reset to 0.Unintentionally done first at DX, therefor DX and SX LM A1 encoder were ...