LgswDichroicSystemSX test and optics installation 8:00: we start updating the control software of the DichroicServiceController. We set the parameters equal to th...
LgswDichroicSystemSX installation LgswDichroicSystemSX test We tested the movement of the dichroic and fold mirror both at Zenith and horizon using the DichroicS...
LgswDichroicSystemSX with Laser tracker 8:00: we started acquiring the telescope coordinate reference system. 3 corner cubes were mounted on the dichroic cell and...
9:00: beginning of operations with laser tracker. We attach the portable laser head on the opposite side of the primary and we shine it on the flat mirror attache...
Pockels cells trasmission TN Notes '20150429_202605','20150429_202729' 91, 107, 87 QC test We build a new QC REC for the QC: 20150429_112300. The IM ...
Hip56107 19:45: new LGSW dark: 2050430_024510, we point Hip56107 sending the preset from LUCI 20:00: we fail... we send a preset from telescope Seeing 0.9" from g...
Hip56107 20:15: spot on PatCams we sweep the focus: TN Notes Plot (Threshold) '20150501_031805', '20150501_031908' Focus Stage sweep, best is at 60k ...
NGC3351 20:00: telescope pointed, we start laser operations. We try to lock TT on the center... but we fail... LGSW spot FWHM: 1.99 (II moment: 1.26), seeing from...
LGSW dark: 20150503_013418 QC and PYR test We setup the system for BIN4, 200Hz, lamp is at 50 steps, FW1 is on 50 50 mirror. Mr=14.0, disturb=1.2". ~75phot/subap...
We develop some software and reduce the galaxies images. 22:00: we try to send a preset with telescope closed to check the offset behaviour, no success... Main....