50 recent changes in ARGOSPublic Web retrieved at 23:50 (GMT)

DayTime20150223
We close the loop with LGSW FLAO BIN2 TS. LGSW SLOPE_OFFSET: 20150223_223830 LGSW DARK: 20150223_225520 TN AO rec JCL PCL Res. WF nm rms Notes ...
LaserInterlockPanel
Description The interlock panel handles two independent interlock loops. One loop opens or closes the laser head internal safety shutters. This laser interlock lo...
PiezoController
Description The servo switches are intended to choose, if the piezos are operated in open (off) or closed loop (on). Upper switch: X axis Lower switch:Y axis Doc...
PiezoController02
Known history When Where Who What 20130215 Know issues When What 20130305 description of issue Current known config IP, firmwar...
PiezoController01
Known history When Where Who What 20130215 Know issues When What 20130305 description of issue Current known config IP, firmwar...
MoconLLPSX
Known history When Where Who What 20130215 Know issues When What 20130305 description of issue Current known config IP: 192.168...
MoconLLPDX
Known history When Where Who What 20130215 Know issues When What 20130305 description of issue Current known config IP: 192.168...
TempCtrlAndAuxCopy02
Known history When Where Who What 20130215 Know issues When What 20130305 description of issue Current known config IP, firmwar...
WavecommThor
Documentation User manual (ITA): ARGOS_THOR_MU_20130201.pdf Default configuration: * IP: 192.168.1.150 * Netmask: 255.255.255.0 * Gateway: 192.168.1.254 ...
TemperatureCtrlAndAux
Description This device monitors the temperature and humidity values of the LaserSystem. Documentation * User manual: http://abell.as.arizona.edu/~hill/xlbt...
VibrationSystemSx
Documentation attach and describe datasheets and documents Installation and maintenance describe what is needed to put a new device of this kind into operation s...
VibrationSystemDx
Documentation attach and describe datasheets and documents Installation and maintenance describe what is needed to put a new device of this kind into operation s...
VibrationSystem
Description The ARGOS vibration control system is designed to detect vibrations on the instrument optical path at a level sufficient to calculate and mitigate the...
LedSources
Documentation Technical documents * DCS_user_manual.pdf: Diode Current Source user manual (JZ). * DSQ3K_user_mode software_manual.pdf: DSQ3K driver user mo...
ThermocoupleReadoutModule
Known history When Where Who What 2014 LBT JZ Installed in CRingRackDx Know issues When What 20130305 description of issue Conf...
PneumaticShutterController
Description The pneumatic dust shutter controller is a remote controlled device, which operates the dust shutter pneumatic cylinders. Known history When Wher...
ElectronicRackLLP
Description There are 2 electronic racks is installed on the Laser Launch Platform. They contains power distribution, cooling and other LAS devices. They contain ...
ElectronicRackLSP
Description There are 2 electronic racks is installed on the Laser Supply Platform. They contains power distribution, cooling and other LAS devices. They are atta...
ElectronicRack
Description ARGOS installed 8 electronics racks on the LBT: * 2x ElectronicRackCRing * 2x ElectronicRackLgsw * 2x ElectronicRackLLP * 2x ElectronicRac...
ElectronicRackCRing
Description There are 2 C ring electronic racks is installed on the LBT C ring extension. They contains shared devices between the whole ARGOS system. Since they ...
ElectronicRackLgsw
Description The LGSW electronic rack is installed on the LUCI platform. It contains all the devices to control the LgswUnit and the LgswDichroic. It needs 110VAC ...
AvtCamera
Description The 3 acquisition units in each LgswUnit are based on AVT GC1350 cameras. The 12V power supply is installed in the MoCon. The ethernet cable is connec...
LgswSystem
Description The term "LGSW System" refer to all the HW and SW related to the ARGOS laser guide star wavefront sensor on a single LBT eye. An LGSW system is compos...
RegulatedCoolingLine
Definition It is a cooling circuit in which the cooling fluid temperature never goes below 6°C and follows the ambient temperature when it is warmer than 6°C. The...
HowToDeployDichroic
How to deploy dichroic from ARGOS control software 1. See FullARGOSStartUpProcedure for prerequisites: chiller, main power, login into workstation 1. Start ...
HowToPowerUpLGSW
This procedure brings up the LGSW system until the WFS is ready for on sky operation i. See FullARGOSStartUpProcedure for prerequisites: chiller, main power, l...
HowToPowerUpLAS
This procedure brings up the LAS system until lasers are ready to be propagated on sky i. See FullARGOSStartUpProcedure for prerequisites: chiller, main power,...
HowToEnableMainPower
The ARGOS main power switches are located in the SX LaserSupplyRack on the LaserSupplyPlatform. They should be on all the time. If they are not on enable them i...
HowToRecoverStuckLgswPupilMotor
A session on this topic has already been created in the Device List pages of the NSA12 stepper motors: * Symptom * Possible cause * Procedure to recover ...
NSA12NotHoming
Symptom When the motor is homed the step counter starts to decrease until but never stops. The full stroke of the motor is about 1500 steps; so no matter what the...
MonitServiceManager
How to start i. Connect to the workstation i. Start argos_monit by executing the program for your workstation: host start up command dx lalas ar...
DayTime20150221
LgswUnitDx operation 8:00: we start opertations at horizon to fix the CalUnitSystem DiodeSource problem. It seems related to the low temperature in the C ring rac...
DayTime20150220
LM1 calibration DX Measuring the LM1 limit switch position as well as the optical and mechanical zero position. Lower limit AbsEnc IncEnc SW setting 1913 51...
NightTime20140322
Night Time 20140322 6:00 II test of new collimation tables. JH wants to check the preset acquire accuracy with and without the dichroic in. Telescope pointed to...
DayTime20150218
See e mail from Michael L.: Dear Friends of ARGOS, Yesterday (2/18/15) and today (2/19/15), ARGOS activities included the following: Installation and test of the ...
DayTime20150215
See e mail from Gustavo: All, Work has continued on the DX LM1 actuators by M, M and F. Julian Z. arrived yesterday, and he has been working on the alarm system a...
DayTime20150213
See e mail from Gustavo: The February 2015 ARGOS campaign started yesterday. Matthias, Mathias and Franz from MPE are on site. The first two days of the campaign...
DayTime20150219
Pockels Cells Transmission test Sweep between 0.5 and 2.0us with 4 steps with Internal Sources. Then between 0.1 and 2.0 in 11 steps. The system configuration is ...
HowToConnectToARGOSWorkstationAtLBT
The following instructions apply if you are connecting from outside the telescope network. If you are at the telescope just follow HowToLogInAndConnectToVNC Logi...
HowToCreateLBTCatalogFiles
How to create an LBT star catalog file If you want to point and guide on a star it is mandatory to have a catalog file installed in the LBT TCS. Catalog file form...
NightTime20141129
The list of targets and LUCI images is here: raw_20141129.txt 21:00: we start the telescope collimation and we resume the tubone. PatCam X Y Blue 172 ...
DichroicController6
Label The S/N of this unit is ??? Known history When Where Who What 20150124 MPE JZ JZ says it should be at LBT Know issues When What ...
RTAStepperMotor0
Known history When Where Who What 20130215 Know issues When What 20130305 description of issue Previous config copy and paste f...
NightTime20141128
18:00: we start setting up the system: we acquire new Dark: 20141129_020106 TN Notes 20141129_020106 w/o light 20141129_020618 ^ 20141129_0207...
NightTime20141130
20:30: we point telescope LAN Asti ToF 160k 460 84.0 FLAO Z stage is at 50mm, we change the ToF to 84us and we close the loop. We change in close...
DiaryRun4
Plan * Task_ for_November_ run_2014.docx: Task_ for_November_ run_2014.docx * ARGOS_Nov28_To_Dec2_2014.txt: TargetListRun4 Pictures Activity summary When ...
DayTime20141202
PBL in the ASM IDL code: if the loadDisturbance command fails, to recall it you have to send first slopes w/o disturb and gain 0 to reset the ASM disturbance bit....
DayTime20141201
18:00: PCT with IS Since bad weather we work on SW development. 20:00: we attempt a laser propagation but the clouds are too thick. TN Notes 20141202_0414...
DayTime20141130
We connect the BCU power supply line to the Agilent oscilloscope. 18:00: we start operation swith calibration unit monitoring the BCU voltage. 20:00: after repea...
DayTime20141129
HEXA X Y Z Rx Ry 6.02 7.27 4.33 510 240 We flatten with FLAO and ARGOS TN Notes 20141129_231158 We load disturb = 1.2" and ...
Number of topics: 50
< Previous Page 10 of 15 Next >

See also: rss-small RSS feed, recent changes with 50, 100, 200, 500, 1000 topics, all changes

This topic: ARGOSPublic > WebHome > WebChanges
Topic revision: 16 Feb 2013, AoAdmin
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding AOWiki? Send feedback