20151005 | WG+DP arrival and Gusset installation | DayTime20151005 | |
20151009 | SX swing arm shimming | DayTime20151009 | Power cycling of swing arm controller recovered not understood network connection loss. Raining into the dome. |
20151022 | Sx LGS guiding calibrations, BeamShaping test | NightTime20151022 | Bad M3 alignment, Hip9680 |
20151007 | SX CalSource laser tracker and visible on table alignment | DayTime20151007 | Raining into the dome. |
20151008 | SX CalSource adjustment on WFS table with screen | DayTime20151008 | |
20151021 | SW debug, CalUnit activity on Sx | NightTime20151021 | Humidity & snow |
20151006 | Setup laser tracker and first measurment | DayTime20151006 | |
20151018 | Measure of LgswUnitSx FoVs | DayTime20151018 | |
20151023 | LgswUnitSx open loop data, VibComp gain optimization and test, TipTiltSensor calibrations | NightTime20151023 | Hip102605, Hip18130, Hip18130, Hip28711 |
20151019 | LgswUnitSx internal calibrations. LAT pointing test | DayTime20151019 NightTime20151019 | Humidity |
20151015 | LgswUnitSx installation | DayTime20151015 | |
20151014 | LgswUnitDx connection. LgswUnitSx pipes installed. LBC Sx serviced (mots!). CalUnitSx alignment check with mask. | DayTime20151014 | Glycole spilling on DX. |
20151016 | LgswUnitDx and LgswUnitSx configuration and test | DayTime20151016 | Rainy night |
20151012 | LAT cabling and testing | DayTime20151012 | |
20151013 | Full team arrival | DayTime20151013 | |
20151010 | First try of LAT mounting | DayTime20151010 | |
20151011 | Final LAT alignment and mounting. | DayTime20151011 | Swing arm controller was switched of already the night before. SX pupil mirror not moving. |
20151017 | AgwSx installation, TT fiber routing | DayTime20151017 | Rain |
20151020 | AArb & LAT test | NightTime20151020 | Humidity & clouds |