8:00: we start setting up the system for calibrations. HEX X Y Z Rx Ry 3.02 6.27 4.35 324 155 Acquired new DARK: 20141126_160957 We...
DayTime20141127
8:30: start of calibration unit activity, spots are already in LGSW HEXA X Y Z Rx Ry 5.02 7.27 4.38 365 135 We close the loop witho...
DayTime20141128
8:30: we start setting up the system for calibrations 9:30: ready to close the loop on ARGOS we acquire a Board setup: 28 Nov 14_argos_calibunit with FLAO BIN4 PB...
DayTime20141129
HEXA X Y Z Rx Ry 6.02 7.27 4.33 510 240 We flatten with FLAO and ARGOS TN Notes 20141129_231158 We load disturb = 1.2" and ...
DayTime20141130
We connect the BCU power supply line to the Agilent oscilloscope. 18:00: we start operation swith calibration unit monitoring the BCU voltage. 20:00: after repea...
DayTime20141201
18:00: PCT with IS Since bad weather we work on SW development. 20:00: we attempt a laser propagation but the clouds are too thick. TN Notes 20141202_0414...
DayTime20141202
PBL in the ASM IDL code: if the loadDisturbance command fails, to recall it you have to send first slopes w/o disturb and gain 0 to reset the ASM disturbance bit....
DayTime20150213
See e mail from Gustavo: The February 2015 ARGOS campaign started yesterday. Matthias, Mathias and Franz from MPE are on site. The first two days of the campaign...
DayTime20150215
See e mail from Gustavo: All, Work has continued on the DX LM1 actuators by M, M and F. Julian Z. arrived yesterday, and he has been working on the alarm system a...
DayTime20150218
See e mail from Michael L.: Dear Friends of ARGOS, Yesterday (2/18/15) and today (2/19/15), ARGOS activities included the following: Installation and test of the ...
DayTime20150219
Pockels Cells Transmission test Sweep between 0.5 and 2.0us with 4 steps with Internal Sources. Then between 0.1 and 2.0 in 11 steps. The system configuration is ...
DayTime20150220
LM1 calibration DX Measuring the LM1 limit switch position as well as the optical and mechanical zero position. Lower limit AbsEnc IncEnc SW setting 1913 51...
DayTime20150221
LgswUnitDx operation 8:00: we start opertations at horizon to fix the CalUnitSystem DiodeSource problem. It seems related to the low temperature in the C ring rac...
DayTime20150222
LgswUnitDx operation 8:30: we start and we toss light on the LGSW. Using hexapod parameters of yesterday we are not in the LGSW but just in the PatCams. Today the...
DayTime20150223
We close the loop with LGSW FLAO BIN2 TS. LGSW SLOPE_OFFSET: 20150223_223830 LGSW DARK: 20150223_225520 TN AO rec JCL PCL Res. WF nm rms Notes ...
DayTime20150423
LgswDichroicSystemSX test and optics installation 8:00: we start updating the control software of the DichroicServiceController. We set the parameters equal to th...
DayTime20150424
LgswDichroicSystemSX installation LgswDichroicSystemSX test We tested the movement of the dichroic and fold mirror both at Zenith and horizon using the DichroicS...
DayTime20150425
LgswDichroicSystemSX with Laser tracker 8:00: we started acquiring the telescope coordinate reference system. 3 corner cubes were mounted on the dichroic cell and...
DayTime20150426
9:00: beginning of operations with laser tracker. We attach the portable laser head on the opposite side of the primary and we shine it on the flat mirror attache...
DayTime20150427
A braket is installed on the DX cal unit to measure the gusset position. Main.MarcoBonaglia 13 May 2015
DayTime20150428
15:00: Cal unit operations HEXA X Y Z Rx Ry 2.77 8.90 2.00 51.0 103.0 These are the positions for the Hexapod after the cal unit ha...
DayTime20150429
Pockels cells trasmission TN Notes '20150429_202605','20150429_202729' 91, 107, 87 QC test We build a new QC REC for the QC: 20150429_112300. The IM ...
DayTime20150430
Best focus on LUCI2 15:00: switch BCU swap: SX one is now in the DX ASM 17:40: cal unit in, we close on LGSW only HEXA 2.94 8.18 2.08 150 12 Boa...
DayTime20150501
LGSW DARK: 20150501_230325 Pockes cell Transmission with IS TN Sup Plot '20150501_230444','20150501_23601' 93, 131, 73 QC vs PYR in DT (incom...
DayTime20150629
14:00: system is up since the morning. We close the loop on LGSW only. We check QC behaviour because we have problems keeping the TT loop closed on that. One quad...
DayTime20150630
LGSW FoV center on PatCams 10:00: spots are within the LGSW FoV, we have strong coma: we must flatten the shell. We close the loop on LGSW only and then we save a...
DayTime20150701
10:00: cal unit deployed We start testing the new RECs: we load GLAO2 PYR BIN2 generated by TM TN Notes 20150701_182848 GLAO2, pyr bin2 20150701_182...
DayTime20150706
Main.GillesOrban 28 Jul 2015 disturb 1.2'', closed loop with QC with different fluxes: TN AO Gain Res. WF nm rms AO rec DIMM " g JCL PCL Not...
DayTime20150820
Pockels Cells Driver On sx lgsw in the /home/argos/the_pcd folder created pcd_start and pcd_stop to start/stop the PCD accordingly to JZ email of 150612 Zabbix S...
DayTime20150821
Diary 20150820_23xxxx PockelsCell145 installed in BlueChannel replacing PockelsCell144 20150821_150055 PCT measurement 20150821_163526 PCD off ...
DayTime20150823
20150823_170000 LgswUnitSx is powered off. Disconnected from the rack. 20150823_180000 LgswUnitDx is completely disassembled apart for WfsCamera and lenslet...
DayTime20150824
Activity on LgswUnitDx Aligment of pupil motors Pupil motors have been shimmed to bring the stage working position closer to 0. We experienced on LgswUnitSx some...
DayTime20150825
Piezo mirrors alignment Alignment of periscopes. The flange has been remachined at LBT for the new periscope mirrors holders. Gola is to get the beam after the pe...
DayTime20150826
LGSW CalUnit alignment After having assembled the WFS up to the periscope we inserted the calibration unit into it. To start aligning the CalUnit the pupil motors...
DayTime20150827
Pockels cells installation A try was done to install insulating foam inside the EM shield boxes. Armaflex foam was provided by MPE in several adhesive sheets. Aft...
DayTime20151005
SX T Gusset installation * At horizontal tube, turn upper shaft fully in. * At inclined tube, turn shaft only so far that there is the same distance in both...
DayTime20151006
Laser Tracker measurement on SX * Attachment of the retro plate on gusset. Extending the CalUnit holder focusing screw to avoid collision with DX. * Laser t...
DayTime20151007
Laser tracker measurement SX continue * Adjust of roll and tilt as well as position in park position with continuous check by laser tracker after each adjustme...
DayTime20151008
Rotation adjustment of CalUnit Rotation of CalUnit was adjusted within sub mm. The final position of the hexapod an swing arm for the final measurement have been:...
DayTime20151009
LAT testing The LAT was tested by AS in the electronic lab. End switch started to male function and didn't work anymore. It look like it something was with the te...
DayTime20151010
LAT mounting Electronic cabinet installed. LAT put on the telescope but could not be finally mounted. Upper taps for screws didn't fit. Lower ones are a bit to lo...
DayTime20151011
LAT Some adjustments of screws spacers and an additional bracket for the upper screws because they have been on the wrong place. Now the LAT is mounted. SX elect...
DayTime20151012
Swing arms Adjustment of working position on SX. Swap of park position switch to working position switch as this was confused before. Installation of park positio...
DayTime20151014
Horizon activities JZ starts to work on ?? up to 8:00. Zenith activities After telescope is back to Zenith we perform several task in parallel: i. Reconnect c...
DayTime20151016
LgswUnitDx configuration with IS DX LGSW DARK: 20151015_182131 We start redefining the subapertures: we modify the SX ones (20150330_170400). Pup center Subap...
DayTime20151017
It rained all night, even in the dome. 9:30: telescope back to Zenith we increase the air flow on both units: 4l/min on LGSW and 1.5l/min on PCD 16:00: CalUnit de...
DayTime20151018
10:00: startup and CalUnitSystemSx deployed. PockelsCellsTransmission on LgswUnitSx TN Plot Map ('20151018_164604','20151018_164724') Hexa ...
DayTime20151019
13:30: we try to calibrate the PatCam to Hexapod movement. We do steps pf 5" around the LGSW FoVs. SX LGSW PatCam to Hexapod IM: 20151019_203311 We determine also...
DayTime20151208
PockelsCellsTransmission test TNs Plot Map DX: '20151208_211217', '20151208_211250', '20151208_211311', '20151208_211332', '20151208_211353' ...
DayTime20151209
Swing Arm Interlock verification PFC to ARGOS swing arm interlocks have been re established. Test for both sides (DX/SX) have been performed and functionality ver...
Number of topics: 50
< Previous Page 3 of 15 Next >

See also the faster WebTopicList

This topic: ARGOSPublic > WebHome > WebIndex
Topic revision: 16 Feb 2013, AoAdmin
This site is powered by FoswikiCopyright © by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding AOWiki? Send feedback